A platform for research: civil engineering, architecture and urbanism
Tunneling in glacial till
Experimental tunnel constructed at Camp Tuto, Greenland by U S Army Snow, Ice and Permafrost Research Establishment (USA SIPRE) to determine feasibility of underground excavation in permafrost; in construction of portal in summer months, in partly thawed soil, support was used, but no support was necessary in other portions of tunnel; drilling and blasting in frozen soil and rock; steel arches with protective lagging were used to protect workers.
Tunneling in glacial till
Experimental tunnel constructed at Camp Tuto, Greenland by U S Army Snow, Ice and Permafrost Research Establishment (USA SIPRE) to determine feasibility of underground excavation in permafrost; in construction of portal in summer months, in partly thawed soil, support was used, but no support was necessary in other portions of tunnel; drilling and blasting in frozen soil and rock; steel arches with protective lagging were used to protect workers.
Tunneling in glacial till
Explosives Engr
Abel, Jr., J.F. (author) / Jennings, Jr., R.W. (author)
Explosives Engineer ; 39
1961
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunneling Through Glacial Till with an EPBM
British Library Conference Proceedings | 2007
|Piping susceptibility of glacial till
British Library Conference Proceedings | 1997
|Conquering Glacial Till in Ames, Iowa
ASCE | 1997
|Conquering Glacial Till in Ames, Iowa
British Library Conference Proceedings | 1997
|