A platform for research: civil engineering, architecture and urbanism
84 km long 11 m wide desert-highway was constructed under tropical conditions, up to 125 F heat and 96% humidity; structure comprises 15 cm thick mechanically stabilized layer, 10 cm thick asphaltic base course, 8 cm thick asphaltic binder layer, and 3 cm thick asphalt-fine-concrete; experience proved this construction method.
84 km long 11 m wide desert-highway was constructed under tropical conditions, up to 125 F heat and 96% humidity; structure comprises 15 cm thick mechanically stabilized layer, 10 cm thick asphaltic base course, 8 cm thick asphaltic binder layer, and 3 cm thick asphalt-fine-concrete; experience proved this construction method.
Design and construction of Kuwait-Basrah highway
Entwurf und Ausfuehrung der Kuwait-Basrah-Strasse
Fleig, R. (author)
Bitumen ; 23
1961
4 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Intake Works at Basrah Power Station
Engineering Index Backfile | 1961
Al Hadi Permanent Police Station, Basrah, Iraq
NTIS | 2010
|Parasites of Fishes of Basrah Province Marshy Area, Iraq
Online Contents | 1995
|