A platform for research: civil engineering, architecture and urbanism
Safe construction of large roadway fills across waterlogged marshland achieved by gradual loading and outboard mud wave protection; method that minimizes fill subsidence and formation of mud waves was used in building U S 101 Freeway near San Diego.
Safe construction of large roadway fills across waterlogged marshland achieved by gradual loading and outboard mud wave protection; method that minimizes fill subsidence and formation of mud waves was used in building U S 101 Freeway near San Diego.
Marsh road subsidence curbed
Excavating Engr
Day, R. (author)
Excavating Engineer ; 56
1962
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Retrofitting a Curbed Skylight
British Library Online Contents | 2001
|Construction curbed for most federal agencies
Online Contents | 1998