A platform for research: civil engineering, architecture and urbanism
Selset reservoir -- Design and construction
Principal features of design; cutoff trench; embankment; settlement; slipped ground area and relief of water pressure; overflow works; control of water; cost.
Selset reservoir -- Design and construction
Principal features of design; cutoff trench; embankment; settlement; slipped ground area and relief of water pressure; overflow works; control of water; cost.
Selset reservoir -- Design and construction
Instn Civ Engrs -- Proc
Kennard, J. (author) / Kennard, M.F. (author)
1962
28 pages
4 Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reservoir Dobromierz - design, construction, exploitation
British Library Conference Proceedings | 1994
|Design and Construction of Geist Reservoir
Wiley | 1945
|Design and construction of Carron Reservoir
Engineering Index Backfile | 1939
|Design and construction of balancing reservoir
Engineering Index Backfile | 1950
|Design and construction of Carron Reservoir
Engineering Index Backfile | 1940
|