A platform for research: civil engineering, architecture and urbanism
Tunnel projects link operations -- Improve safety in Ohio quarry
In latest of 4 separate tunneling and lining projects completed in last 10 yr in Lima quarry of Nat Lime and Stone Co, new quarry area was connected with haulage system installed in older workings; design involved 330 ft long tunnel at quarry floor level under highway embankment; solid limestone was utilized for sidewalls, and arched roof lining of 10 gage Armco liner plates installed.
Tunnel projects link operations -- Improve safety in Ohio quarry
In latest of 4 separate tunneling and lining projects completed in last 10 yr in Lima quarry of Nat Lime and Stone Co, new quarry area was connected with haulage system installed in older workings; design involved 330 ft long tunnel at quarry floor level under highway embankment; solid limestone was utilized for sidewalls, and arched roof lining of 10 gage Armco liner plates installed.
Tunnel projects link operations -- Improve safety in Ohio quarry
Pit Quarry
Pit and Quarry ; 54
1962
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Technology in quarry operations
British Library Online Contents | 2015
|Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry
British Library Conference Proceedings | 2021
|New tunnel to improve Baltimore and Ohio mountain operation
Engineering Index Backfile | 1911
Special equipment for quarry operations Liebherr
British Library Online Contents | 2014
Tunnel vision at Taff's Well Quarry, Wales
Online Contents | 2009
|