A platform for research: civil engineering, architecture and urbanism
Flat jacks pre-load massive mine supports
Construction, testing, and preloading of 10 large prestressed concrete mine pillars show that roof over and around pillar should be pattern bolted, and bolts should be retightened several times; pillar should be built monolithically of high grade concrete, and prestressed with external banding; second set of flat jacks should permit high ultimate loading after first set eliminated excess structural slack.
Flat jacks pre-load massive mine supports
Construction, testing, and preloading of 10 large prestressed concrete mine pillars show that roof over and around pillar should be pattern bolted, and bolts should be retightened several times; pillar should be built monolithically of high grade concrete, and prestressed with external banding; second set of flat jacks should permit high ultimate loading after first set eliminated excess structural slack.
Flat jacks pre-load massive mine supports
Pennsylvania State Univ -- Mineral Experiment Station -- Bul
Reed, J.J. (author) / Mann, C.D. (author)
1961
8 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Measurement of Load Eccentricity Using Flat Jacks
British Library Conference Proceedings | 2002
|Measurement of Stress in Sandstone Blockwork Using Flat Jacks
British Library Online Contents | 1997
|Engineering Index Backfile | 1947
|Experience gained in rock mass deformability testing by large flat jacks
British Library Conference Proceedings | 2001
|Experimental calibration of flat jacks for in-situ testing of masonry
Taylor & Francis Verlag | 2019
|