A platform for research: civil engineering, architecture and urbanism
Maintenance of hydro-electric schemes and development of sidestream intakes
Maintenance of 3 hydroelectric schemes of British Aluminium Co, Ltd in Scotland; works for prevention of embankment erosion, maintenance of concrete tunnel linings, clearing of tunnel intakes, and use of vortex device to remove entrained air from tunnel; experience with use of side-stream intakes to main tunnel and resulting excessive maintenance work; design difficulties of sidestream intakes.
Maintenance of hydro-electric schemes and development of sidestream intakes
Maintenance of 3 hydroelectric schemes of British Aluminium Co, Ltd in Scotland; works for prevention of embankment erosion, maintenance of concrete tunnel linings, clearing of tunnel intakes, and use of vortex device to remove entrained air from tunnel; experience with use of side-stream intakes to main tunnel and resulting excessive maintenance work; design difficulties of sidestream intakes.
Maintenance of hydro-electric schemes and development of sidestream intakes
Instn Civ Engrs -- Proc
Morgan, H.D. (author) / Thomas, D.D.R. (author)
1961
26 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1993
Tasmania's hydro-electric expansion schemes
Engineering Index Backfile | 1949
|Preventing Ice Blockage at Hydro Plant Intakes
British Library Online Contents | 2000
|Some recent swiss hydro-electric schemes
Engineering Index Backfile | 1954
Sidestream elevated pool aeration project
British Library Conference Proceedings | 1994
|