A platform for research: civil engineering, architecture and urbanism
Chemical grout stops water -- In dump fill with 70 percent voids
Combining chemical grout that gelled in 3 sec with cement grout that set in 2 hr solved unusually severe groundwater control problem; method was used in construction of tunnel 139 ft long installed in slag fill under south bank of Monongahela River in Pittsburgh, Pa.
Chemical grout stops water -- In dump fill with 70 percent voids
Combining chemical grout that gelled in 3 sec with cement grout that set in 2 hr solved unusually severe groundwater control problem; method was used in construction of tunnel 139 ft long installed in slag fill under south bank of Monongahela River in Pittsburgh, Pa.
Chemical grout stops water -- In dump fill with 70 percent voids
Civ Eng (NY)
Behre, M.C. (author)
1962
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1998
Engineering Index Backfile | 1963
|Determination of the repair grout volume to fill voids in external post-tensioned tendons
British Library Online Contents | 2012
|