A platform for research: civil engineering, architecture and urbanism
Illustrating and describing an improved transit-theodolite, especially adapted for tunnel work and used in connection with the work on the Simplon Tunnel. (2500 w.) (No. 76266 D)
Illustrating and describing an improved transit-theodolite, especially adapted for tunnel work and used in connection with the work on the Simplon Tunnel. (2500 w.) (No. 76266 D)
The mayer and Wiesmann theodolite
Tacheometre A. Mayer et E Wiesmann
Fonjallaz, L. (author)
1906
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1959
|Belastungsprobe fuer den Asphalt - Test Wiesmann GT MF5
Automotive engineering | 2009
|Nouveau petit theodolite Wild pouvant etre utilise comme theodolite-boussole
Engineering Index Backfile | 1933
Visualisation of Theodolite Errors
British Library Conference Proceedings | 1997
|Théodolite de précision askania
Online Contents | 1950
|