A platform for research: civil engineering, architecture and urbanism
Precast concrete framing units for Navy warehouse
Dense concrete, accurately controlled under "factory" casting conditions, avoidance of need for shoring under second floor system and greater speed in building erection, are some of advantages secured by prefabricating second floor framing for 2-story building of 170 × 550-ft plan, built for Navy at San Pedro, Calif; actual cost is some 25% under estimate for cast-in-place construction.
Precast concrete framing units for Navy warehouse
Dense concrete, accurately controlled under "factory" casting conditions, avoidance of need for shoring under second floor system and greater speed in building erection, are some of advantages secured by prefabricating second floor framing for 2-story building of 170 × 550-ft plan, built for Navy at San Pedro, Calif; actual cost is some 25% under estimate for cast-in-place construction.
Precast concrete framing units for Navy warehouse
Eng News-Rec
Engineering News-Record ; 127
1941
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast concrete warehouse construction
Engineering Index Backfile | 1947
|Precast concrete warehouse floor
Engineering Index Backfile | 1942
Seismic Resistant Precast Concrete Office Framing
British Library Conference Proceedings | 1991
|Connections for continuous framing in precast concrete structures
British Library Conference Proceedings | 2001
|