A platform for research: civil engineering, architecture and urbanism
Construction of tunnel under river Maas in Rotterdam
9 tunnel sections each 61.35 m long, 25 m wide, 9.5 m high, 15,000 t, are built ashore, floated out by means of large floaters and placed in dredged channels; details on tunnel section sinking and equipment used; procedure of connecting tunnel sections together; ventilating towers. (See also - n 24 June 14 1941 p 278-9;n 25 June 21 p 289-90)
Construction of tunnel under river Maas in Rotterdam
9 tunnel sections each 61.35 m long, 25 m wide, 9.5 m high, 15,000 t, are built ashore, floated out by means of large floaters and placed in dredged channels; details on tunnel section sinking and equipment used; procedure of connecting tunnel sections together; ventilating towers. (See also - n 24 June 14 1941 p 278-9;n 25 June 21 p 289-90)
Construction of tunnel under river Maas in Rotterdam
Die Bauausfuehrung der Flusstrecke beim Autotunnel unter der Maas in Rotterdam
Schnitter, E. (author)
1941
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Road tunnel under river Maas at Rotterdam
Engineering Index Backfile | 1940
|Highway road tunnel under Maas, Rotterdam
Engineering Index Backfile | 1943
|Highway road tunnel under Maas, Rotterdam
Engineering Index Backfile | 1943
|Manhattismus an der Maas: >>De Rotterdam<<
British Library Online Contents | 2014
|Bürohochhaus Maastoren, Rotterdam - Manhattan an der Maas
Online Contents | 2009
|