A platform for research: civil engineering, architecture and urbanism
Design of Chicago's initial system of subways
Report on location and structural design of 7.7 mi, double-tube, deep level subway; typical cross-sections; foundations; auxiliary structures; mezzanine stations; design of track tunnel sections. (See also - discussion v 13 n 2 Nov 1941 p 508-1 -- 508-8)
Design of Chicago's initial system of subways
Report on location and structural design of 7.7 mi, double-tube, deep level subway; typical cross-sections; foundations; auxiliary structures; mezzanine stations; design of track tunnel sections. (See also - discussion v 13 n 2 Nov 1941 p 508-1 -- 508-8)
Design of Chicago's initial system of subways
Am Concrete Inst -- J
Girard, P.F. (author)
1941
23 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering problems of Chicago's initial system of subways
Engineering Index Backfile | 1941
|Construction of Chicago's initial system of subways
Engineering Index Backfile | 1941
|Engineering Index Backfile | 1928
Engineering Index Backfile | 1908
Earthquake design criteria for subways
Engineering Index Backfile | 1969
|