A platform for research: civil engineering, architecture and urbanism
Chicago's first subway
Methods used in construction of 7.7 mi of twin-tube subway; open cut operations; open face and shield tunneling methods; excavating with clay knives; placing concrete lining.
Chicago's first subway
Methods used in construction of 7.7 mi of twin-tube subway; open cut operations; open face and shield tunneling methods; excavating with clay knives; placing concrete lining.
Chicago's first subway
Excavating Engr
Excavating Engineer ; 34
1940
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Chicago's first subway
Engineering Index Backfile | 1944
Engineering Index Backfile | 1943
Structural design of Chicago's subway
Engineering Index Backfile | 1930
Distribution and placing concrete on Chicago's subway
Engineering Index Backfile | 1940
Engineering Index Backfile | 1896