A platform for research: civil engineering, architecture and urbanism
Methods used in construction of 173 km of road through jungles of southern Sumatra to complete highway link 267 km long, between Palembang and Djambi, paralleling new 8 in. petroleum pipe line.
Methods used in construction of 173 km of road through jungles of southern Sumatra to complete highway link 267 km long, between Palembang and Djambi, paralleling new 8 in. petroleum pipe line.
Strassenbau Palembang-Djambi auf Sumatra
Strassenbau Palembang-Djambi auf Sumatra
Grunder, C. (author)
1941
4 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
"Housing Needs in Developing Countries: The Case of Palembang, South Sumatra"
British Library Conference Proceedings | 1983
|Strassenbau - Druckabsorber für den Strassenbau
Online Contents | 2006