A platform for research: civil engineering, architecture and urbanism
Construction of hydraulic fill embankments for Columbia River highway in Oregon by pumping dredged material as far as 7000 ft with lifts up to 60 ft; getting power to dredge.
Construction of hydraulic fill embankments for Columbia River highway in Oregon by pumping dredged material as far as 7000 ft with lifts up to 60 ft; getting power to dredge.
Hydraulic fills
Pac Bldr Engr
Collier, E.A. (author)
1941
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Liquefaction Potential of Hydraulic Fills
British Library Conference Proceedings | 2009
|Underground Mine Backfilling in Australia Using Paste Fills and Hydraulic Fills
Springer Verlag | 2015
|The bearing capacity of hydraulic fills
Online Contents | 1974
|Field-testing devices for hydraulic fills
Engineering Index Backfile | 1935
|Densification of hydraulic fills by vibroflotation technique
British Library Conference Proceedings | 2005
|