A platform for research: civil engineering, architecture and urbanism
Railroad grading reaches new scientific levels on southern pacific shasta line change
Application of earth dam construction methods and special features to produce non-subsiding fills and stable free draining cuts were some of means employed to minimize maintenance costs in this project, which is described in detail.
Railroad grading reaches new scientific levels on southern pacific shasta line change
Application of earth dam construction methods and special features to produce non-subsiding fills and stable free draining cuts were some of means employed to minimize maintenance costs in this project, which is described in detail.
Railroad grading reaches new scientific levels on southern pacific shasta line change
Ry Age
Railway Age ; 110
1941
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Many outstanding features of construction mark Southern Pacific Shasta line change
Engineering Index Backfile | 1941
|Railroad relocation around Shasta Dam
Engineering Index Backfile | 1938
Thirty-mile railroad relocation at shasta dam
Engineering Index Backfile | 1941
|Railroad relocation and construction around shasta dam
Engineering Index Backfile | 1941
|Railroad relocation and construction around Shasta Dam
Engineering Index Backfile | 1941
|