A platform for research: civil engineering, architecture and urbanism
Problems encountered in controlling quality of paving concrete on Turnpike, constructed in record time; procedures adopted for maintaining such control; effects of type of concrete placing equipment on quality of concrete; suggestions for preparing paving specifications; concrete mixes; control procedure; paving equipment and procedure. (See also - discussion v 13 n 2 Nov 1941 p 376-1--376-3)
Problems encountered in controlling quality of paving concrete on Turnpike, constructed in record time; procedures adopted for maintaining such control; effects of type of concrete placing equipment on quality of concrete; suggestions for preparing paving specifications; concrete mixes; control procedure; paving equipment and procedure. (See also - discussion v 13 n 2 Nov 1941 p 376-1--376-3)
Concrete control on Pennsylvania Turnpike
Am Concrete Inst -- J
Tyler, I.L. (author)
1941
15 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1939