A platform for research: civil engineering, architecture and urbanism
Boulder transmission line utilizes poured-in-place foundations
Transmission lines from hydroelectric station at Boulder Dam are 220,000-v lines supported on steel towers approximately 234 mi in length; footings of one line are of conventional type while second line uses cast-in-place concrete foundation; cost records, performance tests and construction procedure for cast-in-place foundation discussed.
Boulder transmission line utilizes poured-in-place foundations
Transmission lines from hydroelectric station at Boulder Dam are 220,000-v lines supported on steel towers approximately 234 mi in length; footings of one line are of conventional type while second line uses cast-in-place concrete foundation; cost records, performance tests and construction procedure for cast-in-place foundation discussed.
Boulder transmission line utilizes poured-in-place foundations
Civ Eng (NY)
Reeder, K.A. (author)
1941
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lightweight, poured-in-place roof deck
Engineering Index Backfile | 1951
Poured-in-place 60-in. semi-elliptical sewer
Engineering Index Backfile | 1959
|Seventy-foot concrete flagpole poured erect in place
Engineering Index Backfile | 1919
|