A platform for research: civil engineering, architecture and urbanism
Truck ramps, driers and tent
Details of methods employed in building Mud Mountain Dam in western Washington, with special reference to construction and use of 6700 lin. ft of concrete decked timber trestle for truck access to bottom of narrow 230-ft canyon, and provisions for handling earth fill material including mixing in pit, drying to desired water content and placing.
Truck ramps, driers and tent
Details of methods employed in building Mud Mountain Dam in western Washington, with special reference to construction and use of 6700 lin. ft of concrete decked timber trestle for truck access to bottom of narrow 230-ft canyon, and provisions for handling earth fill material including mixing in pit, drying to desired water content and placing.
Truck ramps, driers and tent
Western Construction News
1941
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|