A platform for research: civil engineering, architecture and urbanism
Description of methods being employed in construction of dam at Walla Walla, Wash; methods are enabling loess to be used in earth fill dam for first time in Far West; two caterpillar elevating graders teamed with 10 bottom dump Euclids move 1000 pay yards per hr; moisture content is watched closely; dam is 3200 ft long, has max height of 145 ft, max width of 800 ft, and will contain 1,771,000 cu yd of compacted fill.
Description of methods being employed in construction of dam at Walla Walla, Wash; methods are enabling loess to be used in earth fill dam for first time in Far West; two caterpillar elevating graders teamed with 10 bottom dump Euclids move 1000 pay yards per hr; moisture content is watched closely; dam is 3200 ft long, has max height of 145 ft, max width of 800 ft, and will contain 1,771,000 cu yd of compacted fill.
Building mill creek dam
Pac Bldr Engr
Averill, W.A. (author)
1941
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1996
Mill Creek Stream Rehabilitation
Online Contents | 1994
Engineering Index Backfile | 1933
Mill creek bridge, Cincinnati, O.
Engineering Index Backfile | 1901
Modeling Fecal Coliform In Mill Creek
British Library Conference Proceedings | 1997
|