A platform for research: civil engineering, architecture and urbanism
Design and construction of San Gabriel dam no. 1
Rock and earth fill dam, about 330 ft max height, for Los Angeles County Flood Control District, California; rock and soil tests; penetration resistance relations; lateral pressure; grouting and drilling operations; overfill and settlement; percolation through dam; construction of spillway of 290,000 cu ft per sec capacity, also outlet works; total cost $17,000,000. (see also discussion in n 9 and 10 Nov p 1783 and Dec p 1886)
Design and construction of San Gabriel dam no. 1
Rock and earth fill dam, about 330 ft max height, for Los Angeles County Flood Control District, California; rock and soil tests; penetration resistance relations; lateral pressure; grouting and drilling operations; overfill and settlement; percolation through dam; construction of spillway of 290,000 cu ft per sec capacity, also outlet works; total cost $17,000,000. (see also discussion in n 9 and 10 Nov p 1783 and Dec p 1886)
Design and construction of San Gabriel dam no. 1
Am Soc Civ Engrs -- Proc
Baumann, P. (author)
1941
40 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and Construction of San Gabriel Dam No. 1
ASCE | 2021
|Design and construction of San Gabriel dam no. 1
Engineering Index Backfile | 1942
|Design and construction of San Gabriel dam no. 1
Engineering Index Backfile | 1942
|TIBKAT | 1968
|Gabriel Goes Gold - Gabriel Poole's medal-winning career
Online Contents | 1998