A platform for research: civil engineering, architecture and urbanism
Special methods used in mixing and placing of concrete in Hiwassee overflow concrete gravity dam of Tennessee Valley Authority, to prevent formation of cracks and to insure weather resistant impervious surface; use of low heat cement; washing, rinsing, and cooling of aggregate; artificially cooling concrete in place; cleaning of horizontal construction joints; steel reinforcement to prevent cracking; temperature studies; cost of crack prevention. (See also - discussion in n 7 and 10 Sept p 1319-26 and Dec p 1910-16)
Special methods used in mixing and placing of concrete in Hiwassee overflow concrete gravity dam of Tennessee Valley Authority, to prevent formation of cracks and to insure weather resistant impervious surface; use of low heat cement; washing, rinsing, and cooling of aggregate; artificially cooling concrete in place; cleaning of horizontal construction joints; steel reinforcement to prevent cracking; temperature studies; cost of crack prevention. (See also - discussion in n 7 and 10 Sept p 1319-26 and Dec p 1910-16)
Crack prevention program, Hiwassee dam
Am Soc Civ Engrs -- Proc
Laurgaard, O. (author)
1941
23 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Crack Prevention Program, Hiwassee Dam
ASCE | 2021
|Crack prevention program, Hiwassee dam
Engineering Index Backfile | 1942
|Hiwassee valley projects -- Hiwassee Project
Engineering Index Backfile | 1946
Engineering Index Backfile | 1940
|Producing aggregates for Hiwassee Dam
Engineering Index Backfile | 1938