A platform for research: civil engineering, architecture and urbanism
Erection of Howrah bridge
Brief illustrated description of great cantilever bridge across Hooghly River at Calcutta; main span 1500 ft long is made up of two cantilever arms each 468 ft long, and central suspended section of 564 ft; superstructure is being erected by use of creeper cranes designed especially for work by Wellman Smith Owen Corp, London.
Erection of Howrah bridge
Brief illustrated description of great cantilever bridge across Hooghly River at Calcutta; main span 1500 ft long is made up of two cantilever arms each 468 ft long, and central suspended section of 564 ft; superstructure is being erected by use of creeper cranes designed especially for work by Wellman Smith Owen Corp, London.
Erection of Howrah bridge
Engineer
Engineer ; 171
1941
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Howrah bridge. Erection of steelwork proceeds
Engineering Index Backfile | 1940
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1922
Fabrication of howrah bridge steelwork
Engineering Index Backfile | 1944
New Howrah Bridge, Calcutta: Construction
Engineering Index Backfile | 1947
|