A platform for research: civil engineering, architecture and urbanism
One of twenty-four hundred
Method of strengthening floor of substandard old wrought iron through truss of Baltimore type, 155 ft long, over Green River near Greenfield, Mass, built in 1895.
One of twenty-four hundred
Method of strengthening floor of substandard old wrought iron through truss of Baltimore type, 155 ft long, over Green River near Greenfield, Mass, built in 1895.
One of twenty-four hundred
Eng News-Rec
Engineering News-Record ; 126
1941
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
[Notes: two hundred and twenty-one illustrations]
DataCite | 1924
One Hundred Twenty-Seven Complete Basic Training
British Library Online Contents | 2000
[Notes: two hundred and twenty-one illustrations]
DataCite | 1924
[Notes: two hundred and twenty-one illustrations]
DataCite | 1924
[Notes: two hundred and twenty-one illustrations]
DataCite | 1924