A platform for research: civil engineering, architecture and urbanism
Dam bridge widened over spillway
Method and equipment used in widening highway U S 89 crossing Jackson Lake dam at Moran, Wyo, 222 ft long; home radiators used to keep work at 50 F until hardened.
Dam bridge widened over spillway
Method and equipment used in widening highway U S 89 crossing Jackson Lake dam at Moran, Wyo, 222 ft long; home radiators used to keep work at 50 F until hardened.
Dam bridge widened over spillway
Roads Streets
Roads and Streets ; 84
1941
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Railroad bridge widened and reinforced
Engineering Index Backfile | 1923
|Reinforced concrete bridge over spillway
Engineering Index Backfile | 1942
Highway widened roadbed structure, widened road and construction method of widened road
European Patent Office | 2023
|Multiple-arch bridge over spillway of grand coulee dam
Engineering Index Backfile | 1944
|Spliced and widened bridge connecting structure and construction method
European Patent Office | 2023
|