A platform for research: civil engineering, architecture and urbanism
Before entering water tower, water passes equalizing tank, constructed of reinforced concrete; tank is divided by concrete wall into two compartments; only one is in use at a time while other can be cleaned; water is fed to tank by means of overflow; floor is flat-slab construction.
Before entering water tower, water passes equalizing tank, constructed of reinforced concrete; tank is divided by concrete wall into two compartments; only one is in use at a time while other can be cleaned; water is fed to tank by means of overflow; floor is flat-slab construction.
Equalizing tank with 660 cubic meters capacity of water works of Oldenburg I.O
Ausgleichsbehaelter fuer 660 Kubikmeter Nutzinhalt auf dem Wasserwerk Oldenburg i.O
Hirt, F. (author)
Zement ; 19
1930
2 pages
2 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Size and elevation of equalizing reservoirs of standard water works
Engineering Index Backfile | 1930
|Secondary elements for water works and sewerage meters
Engineering Index Backfile | 1936
|Marine suction and carrying dredge with an effective capacity of 60, 000 cubic meters per day
Engineering Index Backfile | 1914
|Engineering Index Backfile | 1907
|Engineering Index Backfile | 1945
|