A platform for research: civil engineering, architecture and urbanism
Construction of wood-stave pipe line for the Vermunt power plant
Report on design and construction of wood-stave pipe line, 1.8 m. internal diam., 440 m. long, for operation of hydroelectric power plant; average head 0.75 atmos.; Scobey formula used in design; total cost of pipe line and appurtenances was 150,000 marks.
Construction of wood-stave pipe line for the Vermunt power plant
Report on design and construction of wood-stave pipe line, 1.8 m. internal diam., 440 m. long, for operation of hydroelectric power plant; average head 0.75 atmos.; Scobey formula used in design; total cost of pipe line and appurtenances was 150,000 marks.
Construction of wood-stave pipe line for the Vermunt power plant
Bau einer Holzrohrleitung fuer das Vermuntkraftwerk
Bautechnik ; 8
1930
3 pages
6 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of wood-stave pipe
Engineering Index Backfile | 1923
|Specifications of construction of wood-stave pipe line
Engineering Index Backfile | 1930
|Repairing a wood-stave pipe-line
Engineering Index Backfile | 1921
|Engineering Index Backfile | 1930
|Wood-stave pipe repaired under pressure
Engineering Index Backfile | 1939
|