A platform for research: civil engineering, architecture and urbanism
Construction of piottino hydroelectric power plants
Features of 90,000-hp. development on Ticino River, between Lavorgo and Biasca in Canton of Tessin, Switzerland; 9-km. tunnel driven through rock formations with Ingersoll-Rand drills.
Construction of piottino hydroelectric power plants
Features of 90,000-hp. development on Ticino River, between Lavorgo and Biasca in Canton of Tessin, Switzerland; 9-km. tunnel driven through rock formations with Ingersoll-Rand drills.
Construction of piottino hydroelectric power plants
Vom Bau des Kraftwerks Piottino
1930
3 pages
5 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Bitumen in construction of hydroelectric power plants
Engineering Index Backfile | 1937
|Modern Hydroelectric Power Plants
Engineering Index Backfile | 1930
|The construction of modern hydroelectric plants
Engineering Index Backfile | 1922
|Bibliography: Underground hydroelectric power plants
Engineering Index Backfile | 1956
|