A platform for research: civil engineering, architecture and urbanism
Methods of construction of concrete gravity dam, 22 m. maximum height, and of penstock 990 m. long; details of bottom lining of reservoir consisting of 10 cm. layer of concrete, bituminous coating and superimposed layers of sand and gravel.
Methods of construction of concrete gravity dam, 22 m. maximum height, and of penstock 990 m. long; details of bottom lining of reservoir consisting of 10 cm. layer of concrete, bituminous coating and superimposed layers of sand and gravel.
Construction of storage reservoir and penstocks of bringhausen pumped-storage hydroelectric plant
Die Bauarbeiten am Speicherbecken und an der Rohrbahn des Speicherkraftwerkes Bringhausen
Walch (author)
Bautechnik ; 8
1930
5 pages
16 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Winter operation of exposed penstocks at hydroelectric stations and pumped-storage plants
Springer Verlag | 1975
|Winter operation of exposed penstocks at hydroelectric stations and pumped-storage plants
Online Contents | 1975
|Construction of the Nurek hydroelectric station penstocks
Springer Verlag | 1972
|Construction of the Nurek hydroelectric station penstocks
Online Contents | 1972
|Design of penstocks of pumped-storage stations
Online Contents | 1985
|