A platform for research: civil engineering, architecture and urbanism
Hydroelectric development in Schwarzwald region in Rhine River basin, utilizing storage in natural mountain lake by means of series of tunnels; total useful head of 600 m. utilized in three stages, developing total of 500,000,000 kw-hr. per annum; construction of tunnels, small dams, power houses, etc.
Hydroelectric development in Schwarzwald region in Rhine River basin, utilizing storage in natural mountain lake by means of series of tunnels; total useful head of 600 m. utilized in three stages, developing total of 500,000,000 kw-hr. per annum; construction of tunnels, small dams, power houses, etc.
Schluchsee Hydroelectric Plant
Das Schluchseewerk
Eisenlohr, A. (author)
Bautechnik ; 8
1930
5 pages
14 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Forstlicher Erholungsplan Schluchsee
TIBKAT | 1976
|New methods in construction of eichholz tunnel of schluchsee hydroelectric power development
Engineering Index Backfile | 1930
|