A platform for research: civil engineering, architecture and urbanism
Hydroelectric plant with output of 36,000 hp.; nearly 2,000,000 cu. m. were excavaed for power house, construction of which consumed 50, 000 cu. m. concrete; lock was built in river with 75,000 cu. m. concrete; concrete road was built to connect power station with main highway.
Hydroelectric plant with output of 36,000 hp.; nearly 2,000,000 cu. m. were excavaed for power house, construction of which consumed 50, 000 cu. m. concrete; lock was built in river with 75,000 cu. m. concrete; concrete road was built to connect power station with main highway.
New Uppenborn Power Station in Munich
Das neue Uppenbornkraftwerk der staedtischen Elektrizitaetswerke Muenchen
Pistor, L. (author)
Zement ; 19
1930
2 pages
3 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Westfriedhof underground station in Munich
British Library Online Contents | 2001
Examples - Westfriedhof underground station in Munich
Online Contents | 2001
Subsurface Freezing at the Marienplatz Underground Station in Munich
British Library Online Contents | 2005
|Apartment Building in Munich bogevischs buero, Munich
British Library Online Contents | 2015
British Library Online Contents | 2003
|