Repair work on masonry of levensauer high bridge
Cracks formed in masonry of abutment piers and towers of steel-arch bridge, having span of 163.4 m., carrying railroad over Kaiser-Wilhelm Canal; method of investigating cracks; plan of borings in face of abutment piers; compressed-air grouting with pressure varying from 7 to 8 atmos.; total cost 105,000 marks.
Repair work on masonry of levensauer high bridge
Cracks formed in masonry of abutment piers and towers of steel-arch bridge, having span of 163.4 m., carrying railroad over Kaiser-Wilhelm Canal; method of investigating cracks; plan of borings in face of abutment piers; compressed-air grouting with pressure varying from 7 to 8 atmos.; total cost 105,000 marks.
Repair work on masonry of levensauer high bridge
Instandsetzungsarbeiten am Mauerwerk der Levensauer Hochbruecke
Bautechnik ; 8
1930
3 pages
10 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Repair of 130-Year Old Masonry Bridge using High-Performance Cement Grout
Online Contents | 2002
|Concrete as a substitute for masonry in bridge work
Engineering Index Backfile | 1888
|Online Contents | 1996
British Library Online Contents | 1996
British Library Conference Proceedings | 1984
|