A platform for research: civil engineering, architecture and urbanism
Guri project
Work under way in Venezuela on first stage of three stage long-range hydroelectric scheme is described; design has as its ultimate goal development of about 14,000 Mw from Guri and other hydro plants on Caroni River; first stage includes construction of concrete gravity main dam, 100 m high, and power house with initial capacity of 527, 250 kW in three units; dam, plus saddle dikes, will create reservoir with total storage of 17,700 million cu m and usable storage of 11, 800 million cu m at 20-m drawdown; 10 intakes will be constructed in this initial segment providing for first three units plus seven future units.
Guri project
Work under way in Venezuela on first stage of three stage long-range hydroelectric scheme is described; design has as its ultimate goal development of about 14,000 Mw from Guri and other hydro plants on Caroni River; first stage includes construction of concrete gravity main dam, 100 m high, and power house with initial capacity of 527, 250 kW in three units; dam, plus saddle dikes, will create reservoir with total storage of 17,700 million cu m and usable storage of 11, 800 million cu m at 20-m drawdown; 10 intakes will be constructed in this initial segment providing for first three units plus seven future units.
Guri project
Water Power
Sorensen, K.E. (author) / Roberts, D.P. (author)
Water Power ; 17
1965
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Monitoring the behaviour of Guri hydroelectric project
British Library Conference Proceedings | 2000
|Ecological recovery of borrow areas for Guri hydroelectric project
British Library Conference Proceedings | 2000
|Monitoring Guri Spillway Plunge Pool
British Library Conference Proceedings | 1999
|Guri dam : world's highest dam raising
British Library Conference Proceedings | 1994
|Robot assists with Guri Dam spillway repairs
British Library Online Contents | 2012
|