A platform for research: civil engineering, architecture and urbanism
Hydroelectric project on Lower Durance in France with annual production capacity of 675 million kwh is described; project includes 24 km long intake canal which has flow rate of 250-cu m/sec; work was carried out in heterogeneous ground and presented difficult problems of excavation, and stabilization of embankment slopes.
Hydroelectric project on Lower Durance in France with annual production capacity of 675 million kwh is described; project includes 24 km long intake canal which has flow rate of 250-cu m/sec; work was carried out in heterogeneous ground and presented difficult problems of excavation, and stabilization of embankment slopes.
Saint-Esteve-Janson plant
Amenagement de Saint-Esteve-Janson
Plichon, J.N. (author)
1964
39 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Saint-Esteve-Janson hydroelectric development on Durance (River)
Engineering Index Backfile | 1961
|British Library Online Contents | 2007
|Strafanstalt in Sant Esteve Sesrovires
Online Contents | 1992
|