A platform for research: civil engineering, architecture and urbanism
Traveling scaffold helps repair long concrete viaduct
Description of special steel scaffold, providing working platform on underside of structure for cutting out and replacing disintegrated concrete, in making extensive repairs to North Hill multiple arch concrete viaduct, 2840 ft long, in Akron, Ohio; replacing deteriorated concrete; cutting out portions of slab and beams with air tools.
Traveling scaffold helps repair long concrete viaduct
Description of special steel scaffold, providing working platform on underside of structure for cutting out and replacing disintegrated concrete, in making extensive repairs to North Hill multiple arch concrete viaduct, 2840 ft long, in Akron, Ohio; replacing deteriorated concrete; cutting out portions of slab and beams with air tools.
Traveling scaffold helps repair long concrete viaduct
Construction Methods
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1906
Long concrete-arch viaduct built near Cleveland
Engineering Index Backfile | 1934
|Rehabilitating concrete viaduct
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1912
|