A platform for research: civil engineering, architecture and urbanism
Deep open cut removes California highway tunnel bottleneck
Construction methods and equipment used in converting old, narrow tunnel near Los Angeles, into open cut 200 ft deep, requiring removal of 611,000 cu yd of material.
Deep open cut removes California highway tunnel bottleneck
Construction methods and equipment used in converting old, narrow tunnel near Los Angeles, into open cut 200 ft deep, requiring removal of 611,000 cu yd of material.
Deep open cut removes California highway tunnel bottleneck
Construction Methods
Gallagher, J.D. (author)
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Breaking a state highway bottleneck
Engineering Index Backfile | 1928
|Municipal tunnel and highway at Richmond, California
Engineering Index Backfile | 1915
New express highway eliminates war traffic bottleneck
Engineering Index Backfile | 1943
|Engineering Index Backfile | 1946
|Preliminary Seismic Design Considerations for a Highway Tunnel in Coronado, California
British Library Conference Proceedings | 2008
|