A platform for research: civil engineering, architecture and urbanism
Report on methods and equipment used in construction of part of Haifa-Baghdad highways, about 600 mi total length, paralleling petroleum pipe line of Iraq Petroleum Co. (see also Roy Engrs J v 53 Dec 1939 p 497-519 supp plates; Instn Civ Engrs -- J n 3 and 8 Jan 1940 p 195-216 and (discussion) Oct p 500-15)
Report on methods and equipment used in construction of part of Haifa-Baghdad highways, about 600 mi total length, paralleling petroleum pipe line of Iraq Petroleum Co. (see also Roy Engrs J v 53 Dec 1939 p 497-519 supp plates; Instn Civ Engrs -- J n 3 and 8 Jan 1940 p 195-216 and (discussion) Oct p 500-15)
Haifa-Baghdad road
Surveyor
Briggs, R. (author)
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1940
|