A platform for research: civil engineering, architecture and urbanism
Model study of plans for channel improvement in chain of rocks reach, Mississippi River
Report on model analysis of plans for improvement of navigation conditions through Mississippi river between Merchant's Bridge at St. Louis, Mo, and Alton, Ill, complicated by presence of rock ledges known as Chain of Rock, lock and dam no 26 at Alton, confluence of Missouri river, St. Louis Harbor and Chain of Rocks bridge; study of proposed methods of developing adequate navigation channel.
Model study of plans for channel improvement in chain of rocks reach, Mississippi River
Report on model analysis of plans for improvement of navigation conditions through Mississippi river between Merchant's Bridge at St. Louis, Mo, and Alton, Ill, complicated by presence of rock ledges known as Chain of Rock, lock and dam no 26 at Alton, confluence of Missouri river, St. Louis Harbor and Chain of Rocks bridge; study of proposed methods of developing adequate navigation channel.
Model study of plans for channel improvement in chain of rocks reach, Mississippi River
U S Waterways Experiment Station -- Tech Memo
1939
144 pages
74 Plates
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Canal and locks at chain of rocks, Mississippi River
Engineering Index Backfile | 1955
|Chain of rocks project improves navigation on Mississippi river
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1890
Engineering Index Backfile | 1889
|Discussion on Mississippi River Improvement
ASCE | 2021
|