A platform for research: civil engineering, architecture and urbanism
Salto de Castro
Scheme on Spanish Portuguese border with special reference to two 40-mw Francis sets of 59,000 hp each; turbine runner 3400 mm diam main dam across River Duero, 46 m high, is concrete construction and has spillway divided into four sections; electrically operated tainter gates arranged between concrete piers.
Salto de Castro
Scheme on Spanish Portuguese border with special reference to two 40-mw Francis sets of 59,000 hp each; turbine runner 3400 mm diam main dam across River Duero, 46 m high, is concrete construction and has spillway divided into four sections; electrically operated tainter gates arranged between concrete piers.
Salto de Castro
Salto de Castro
Water Power ; 5
1953
12 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2003
British Library Online Contents | 1996
British Library Online Contents | 2001
Engineering Index Backfile | 1956