A platform for research: civil engineering, architecture and urbanism
Remscheid water works
Supply taken from underground perforated pipes. The drainage ground limited by retaining walls to solid rock, water drawn off as desired. Lift of over 600 ft. Population, 25 to 50 thousand. Translated from the German.
Remscheid water works
Supply taken from underground perforated pipes. The drainage ground limited by retaining walls to solid rock, water drawn off as desired. Lift of over 600 ft. Population, 25 to 50 thousand. Translated from the German.
Remscheid water works
Lon Engineer
1885
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Masonry dams, remscheid and chemnitz water works
Engineering Index Backfile | 1896
Water works of Remscheid, Germany
Engineering Index Backfile | 1894