A platform for research: civil engineering, architecture and urbanism
Prefabricated school for municipality of Linz/Danube (Austria)
Technical description is given of school built up from prefabricated steel parts on 85 cm grid; building is 65.45 m long and its total area is 1082 sq m; foundations consist of prefabricated concrete units; intermediate load bearing structure is space frame of tubular and light steel sections; external wall consists of slabs of light weight steel connections and stanchions; large-size preassembled roof slabs of thin sheet metal form flat-roof; assembling tubular structure took 10 steel erectors 16 days; total building period was 4 mo.
Prefabricated school for municipality of Linz/Danube (Austria)
Technical description is given of school built up from prefabricated steel parts on 85 cm grid; building is 65.45 m long and its total area is 1082 sq m; foundations consist of prefabricated concrete units; intermediate load bearing structure is space frame of tubular and light steel sections; external wall consists of slabs of light weight steel connections and stanchions; large-size preassembled roof slabs of thin sheet metal form flat-roof; assembling tubular structure took 10 steel erectors 16 days; total building period was 4 mo.
Prefabricated school for municipality of Linz/Danube (Austria)
Acier-Stahl-Steel
Acier-Stahl-Steel ; 30
1965
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1996
|British Library Online Contents | 2006
|Peter Behrens - Austria Tabak Linz
Online Contents | 1997
|Peter Behrens, Austria Tabak Linz
British Library Online Contents | 1998
|