A platform for research: civil engineering, architecture and urbanism
Yale "bowl" construction finished in time for Harvard game to-day
Dragline excavators removed about 130,000 cu. yds. of earth. Concrete for lining slopes supporting seats was distributed by a 90-foot tower. (3000 w.) (No. 56631)
Yale "bowl" construction finished in time for Harvard game to-day
Dragline excavators removed about 130,000 cu. yds. of earth. Concrete for lining slopes supporting seats was distributed by a 90-foot tower. (3000 w.) (No. 56631)
Yale "bowl" construction finished in time for Harvard game to-day
Eng Rec
1914
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
|Engineering Index Backfile | 1916
|ASCE | 2021
|Excavation and embankment construction in building the yale bowl
Engineering Index Backfile | 1916
ASCE | 2021
|