A platform for research: civil engineering, architecture and urbanism
Report on construction of 44-ft internal diam iron-lined tunnel at Liverpool; features of work; tunnel lining; use of shield; carriageway; lighting, etc; ventilation; improved arterial roadways; 50-mi trunk highway. (See also Instn Mun and County Engrs -- J v 60 n 4 Aug 15 1933 p 249-69 (discussion) p 269-78)
Report on construction of 44-ft internal diam iron-lined tunnel at Liverpool; features of work; tunnel lining; use of shield; carriageway; lighting, etc; ventilation; improved arterial roadways; 50-mi trunk highway. (See also Instn Mun and County Engrs -- J v 60 n 4 Aug 15 1933 p 249-69 (discussion) p 269-78)
New mersey tunnel and improved roadways
Surveyor
Brodie, J.A. (author)
Surveyor ; 84
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New mersey tunnel and improved roadways
Engineering Index Backfile | 1933
|Engineering Index Backfile | 1934
Engineering Index Backfile | 1934
Engineering Index Backfile | 1932
Engineering Index Backfile | 1934