A platform for research: civil engineering, architecture and urbanism
Middlesex sewerage and sewage disposal scheme
Scheme designed on basis of ultimate population of 2,000,000, giving dry-weather flow of 80,000,000 gal and maximum wet-weather flow of not less than 480,000,000 gal per day; intercepting and low-level sewers; purification works; sludge disposal; estimated cost is 4,200, 000 pounds. Before Royal Sanitary Inst. (see also Sewage Works J v 5 n 6 Nov 1933 p 1054-7)
Middlesex sewerage and sewage disposal scheme
Scheme designed on basis of ultimate population of 2,000,000, giving dry-weather flow of 80,000,000 gal and maximum wet-weather flow of not less than 480,000,000 gal per day; intercepting and low-level sewers; purification works; sludge disposal; estimated cost is 4,200, 000 pounds. Before Royal Sanitary Inst. (see also Sewage Works J v 5 n 6 Nov 1933 p 1054-7)
Middlesex sewerage and sewage disposal scheme
Surveyor
Watson, J.D. (author)
Surveyor ; 84
1933
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Middlesex sewerage and sewage disposal scheme
Engineering Index Backfile | 1933
|Engineering Index Backfile | 1930
Richmond (Yorks) scheme of sewerage and sewage disposal
Engineering Index Backfile | 1956
|Regional sewerage and sewage disposal
Engineering Index Backfile | 1934
Sewerage and sewage disposal in 1944
Engineering Index Backfile | 1945