A platform for research: civil engineering, architecture and urbanism
Design and construction of west Seattle reservoir
Construction of reservoir in cut and fill with sides and bottom paved with concrete slabs; designed for capacity of 68,300,000 gal; low service tanks and pipe connections; supervision and costs. (see also Western Construction News and Highways Bldr v 8 n 16 Oct 1933 p 415-7)
Design and construction of west Seattle reservoir
Construction of reservoir in cut and fill with sides and bottom paved with concrete slabs; designed for capacity of 68,300,000 gal; low service tanks and pipe connections; supervision and costs. (see also Western Construction News and Highways Bldr v 8 n 16 Oct 1933 p 415-7)
Design and construction of west Seattle reservoir
Am Water Works Assn -- J
De Moss, S. (author)
1933
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of west Seattle reservoir
Engineering Index Backfile | 1933
|The Design and Construction of the West Seattle Reservoir
Wiley | 1933
|British Library Conference Proceedings | 1997
|Solid handling design for Seattle West Point
British Library Conference Proceedings | 1995
|