A platform for research: civil engineering, architecture and urbanism
New refuse incinerator at Portland, Oregon
Description of new incinerator having capacity of 225 tons per 24 hr, costing about $234,000; specifications and requirements; incinerator structure; construction of circular furnaces; handling fine ash and clinker; results of test run; grading and landscaping.
New refuse incinerator at Portland, Oregon
Description of new incinerator having capacity of 225 tons per 24 hr, costing about $234,000; specifications and requirements; incinerator structure; construction of circular furnaces; handling fine ash and clinker; results of test run; grading and landscaping.
New refuse incinerator at Portland, Oregon
Am City
Laurgaard, O. (author)
American City ; 48
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The trieste refuse incinerator
Engineering Index Backfile | 1913
Online Contents | 2002
|Modern refuse incinerator -- Sanitary municipal utility
Engineering Index Backfile | 1936
|Portland International Airport, Portland, Oregon
British Library Online Contents | 2002
|City of Kitchener installs modern refuse incinerator
Engineering Index Backfile | 1952
|