A platform for research: civil engineering, architecture and urbanism
Paddington station improvements
Improvement of station of Great Western Railway, London, put in hand 3 yr ago to extend length of platforms to enable them to take trains of from 16 to 18 coaches; practically whole of area required had to be provided by excavation and Westbourne bridge was lengthened by three spans to allow roadway of parcels depot to pass underneath; bridge is of plate-girder design. (See also - n 3535 Oct 13 1933 p 404-6, n 3537 Oct 27 p 457-9 and 466)
Paddington station improvements
Improvement of station of Great Western Railway, London, put in hand 3 yr ago to extend length of platforms to enable them to take trains of from 16 to 18 coaches; practically whole of area required had to be provided by excavation and Westbourne bridge was lengthened by three spans to allow roadway of parcels depot to pass underneath; bridge is of plate-girder design. (See also - n 3535 Oct 13 1933 p 404-6, n 3537 Oct 27 p 457-9 and 466)
Paddington station improvements
Engineering
Engineering ; 136
1933
Supp plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Crossrail update - Improvements at Paddington
Online Contents | 2013
CrossRail Station, Paddington, London
British Library Online Contents | 1996
|Development of Paddington Station
Engineering Index Backfile | 1937
|SPECIFIER'S CHOICE - Paddington Station concourse
Online Contents | 2000