A platform for research: civil engineering, architecture and urbanism
Programs confined to projects effecting immediate savings in operating expenses; facilities completed total only 25% of those for previous year; comparison of annual signaling construction; automatic block signaling; interlocking during 1932; remote and centralized control; train control and cab signal activities.
Programs confined to projects effecting immediate savings in operating expenses; facilities completed total only 25% of those for previous year; comparison of annual signaling construction; automatic block signaling; interlocking during 1932; remote and centralized control; train control and cab signal activities.
Signal construction during 1932
Ry Age
Dunn, J.H. (author)
Railway Age ; 94
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Signaling construction during 1932
Engineering Index Backfile | 1932
Construction during first half of 1932
Engineering Index Backfile | 1932
Steel for construction shows development during 1932
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1933
Survey of construction operations for 1932
Engineering Index Backfile | 1932