A platform for research: civil engineering, architecture and urbanism
Long island is completing another large grade separation project
Project being completed at Valley Stream, NY; extending over track distance of 7640 ft on main line of Montauk division and over 6500 ft on two branches, wall-retained embankment, viaduct and bridge structures required placing of 250,000 cu yd of fill, 55,000 cu yd of concrete and 12,000 tons of structural steel.
Long island is completing another large grade separation project
Project being completed at Valley Stream, NY; extending over track distance of 7640 ft on main line of Montauk division and over 6500 ft on two branches, wall-retained embankment, viaduct and bridge structures required placing of 250,000 cu yd of fill, 55,000 cu yd of concrete and 12,000 tons of structural steel.
Long island is completing another large grade separation project
Ry Age
Railway Age ; 95
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
A&E project was `like completing a jigsaw'
British Library Online Contents | 2012
Grade separation project in St. Louis
Engineering Index Backfile | 1933
|Completing the Second Avenue Subway Project, New York
British Library Conference Proceedings | 2017
|Dunkirk grade separation project has interesting features
Engineering Index Backfile | 1942