A platform for research: civil engineering, architecture and urbanism
Unusual methods feature of grade separation at Norwood, Ont
Construction of single-tracksubway with single through-deck plate-girder span of 59 ft; use of high-capacity, quick-removable tie wires and clamps; sluicing excavation; sheet piling methods; skidding of steel span; concrete plant; handling relief work by contract.
Unusual methods feature of grade separation at Norwood, Ont
Construction of single-tracksubway with single through-deck plate-girder span of 59 ft; use of high-capacity, quick-removable tie wires and clamps; sluicing excavation; sheet piling methods; skidding of steel span; concrete plant; handling relief work by contract.
Unusual methods feature of grade separation at Norwood, Ont
Contract Rec
Muntz, E.P. (author)
Contract Record ; 47
1933
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
Sewage disposal at Southall-Norwood
Engineering Index Backfile | 1915
|Two unusual grade-separation structures in Utah
Engineering Index Backfile | 1932
|